1. This is the facility in Toronto we are moving our hosted service to.
2. This is the rack whose front we need to move to make room for our
server rails.
3. This is the 12mm nut we need to loosen to move the front of the rack up.
4. That shiney bit in the middle by the cable? That is the 12mm socket from the socket wrench that we need to loosen the nut to move the rack up to fit our server rails in. It's 4 feet down and 5 feet over under the raised floor.
We don't have a tile lifter, the facility staff is at some team-builder meeting and my flight back to Boston leaves in 4 1/2 hours.
And no, I did not drop the socket. I need more Red Bull.
Was at the office till 11:30pm last night, couldn't get to sleep till
3am, just in time to get up at 4am. I'm running on 1 hours sleep, Red
Bull and donuts. Be glad I'm not driving.
Waltham Police breaking up a fight.